Develop a comprehensive earned value analysis report. This portfolio work

Develop a comprehensive earned value analysis report.

This portfolio work project, an earned value management analysis, is based on your selected business or IT project. You may choose to base your assessment on the Revive LLC case study for the development of a new online employee orientation module, or you may continue to use a company of your choice. Both human resource (HR) and information technology (IT) employees, as well as contractors, will be utilized in this project.

Earned value management (EVM) is defined “as a methodology that combines scope, schedule and resource management to assess project performance and progress” (Project Management Institute, 2017, p. 705).

Project managers examine cost control, tools, and techniques that define the procedures by which the cost baseline may be changed. They engage in performance measurement to assess the magnitude of variations that occur during project execution. EVM is used to measure project performance by comparing certain predefined variables. Microsoft Project is a tool used to track planned cost versus actual cost, calculate the earned value, and forecast the effects of some cost changes.

Reference

Project Management Institute. Guide to the Project Management Body of Knowledge (PMBOK® Guide) — Sixth Edition and Agile Practice Guide. Newtown Square. PA. 2017.

Scenario

For this assessment, choose either Option A or Option B. You do not need to do both. Both options will be graded using the same scoring guide.

Option A: Project Revive LLC is a consulting firm of highly charged and accomplished project managers whose main stream of revenue comes from managing the turnaround of failing projects. As a consultant with Project Revive LLC you will study, analyze, and manage a failed project from NearlyFree.com. NearlyFree.com is a fictitious company and the project documents for NearlyFree.com project scenario are linked below. The NearlyFree.com project was originally scoped to develop and deploy an automated web-based training system for new employees to reduce the workload and cut down personnel resources required to complete the new employee orientation (NEO) training.

As a veteran member of the Project Revive team, you already know the value of continually examining performance throughout a project to further define and update project data. Special attention to documenting and identifying problems is required in time to make appropriate adjustments. The earned value management (EVM) technique is often used in this type of analysis. Continue your analysis of the failed project by applying the EVM technique to examine performance based on what was accomplished.

Option A Resources:

Option B: You may choose a business of your own. It must include (but is not limited to) the following criteria:

  • Clearly indicate the title of the project in every assessment.
  • You must have access to the following documentation:
    • Scope statement.
    • Final deliverable and product definition.
    • Project work-breakdown structure.
    • Project schedule.
    • Quality plan.
    • Project costs (estimates and actuals).

Your Role

For both Option A or B, you are the project manager.

Requirements

Microsoft Project is the recommended software tool for this course due to its wide industry acceptance and its use in many project management professional roles. To make this easier, you have the ability to download and install your own version of MS Project for use in this course. See the Software Preparation and Technology Access activity in Assessment 1 for more information.

Practice using MS Project in this course will prepare you for future professional PM roles and responsibilities; please use MS Project for those tasks supported by MS Project. If you have access to other tools such as MS Visio, MS PowerPoint, MS Word, or other project management software that you believe may still meet the requirements of this course, please discuss your selected alternative with faculty.

Use the PMBOK® Guide as the model for developing the deliverables.

Earned Value Analysis

Deliverable: Develop an Earned Value Analysis report of the current failed project.

Complete the following:

  • Use Microsoft Project or different, faculty-approved software to show earned value in a list of tasks that measure the cost of the work performed up to a certain date (the current date) based on the Project Schedule [MPP].
  • Consider how you can apply this analysis of the failed project to a successful project turnaround.

Address the following topics. Where necessary, define assumptions you made.

  • Apply an earned value technique.
  • Explain the value of the information provided through the EVM technique.
  • Analyze project success based on earned value calculations.
  • Base project decisions on earned value calculations.
  • Explain how you will apply earned value calculations to a successful project turnaround.

Use the MS Project functionality (or another software program) to:

  • Display project summary information and report.
  • Create project reports.
  • Export project plan cost data into Excel.

Deliverable Format

  • References: There is no set number of references required for this assessment. Use scholarly or academic sources where applicable.
  • Format:
    • Use Microsoft Project to obtain project costs information.
    • Use your choice of MS Word, MS Visio, or MS PowerPoint to develop the comprehensive analyses.
    • These analyses are professional documents and should therefore follow the corresponding Academic and Professional Document Guidelines [PDF], including single-spaced paragraphs.
    • Use APA style and format for references and in-text citations.

Evaluation

By successfully completing this assessment, you will demonstrate your proficiency in the following course competencies through corresponding scoring guide criteria:

  • Competency 1: Apply project cost tools and techniques to ensure project success.
    • Apply an earned value technique.
    • Analyze project success based on earned value calculations.
    • Explain project decisions based on earned value calculations.
  • Competency 4: Communicate effectively in a professional manner consistent with the standards of project management.
    • Explain how earned value calculations apply to a successful project turnaround.

Faculty will use the scoring guide to review your deliverable as if they were your immediate supervisor. Review the scoring guide prior to developing and submitting your assessment.

ePortfolio

This portfolio work project demonstrates your competency in applying knowledge and skills required in the workplace. Include this in your personal ePortfolio.

Share This Post

Email
WhatsApp
Facebook
Twitter
LinkedIn
Pinterest
Reddit

Order a Similar Paper and get 15% Discount on your First Order

Related Questions

After completing Module 5 in Shadow Health, discuss two key

After completing Module 5 in Shadow Health, discuss two key gastrointestinal alterations (such as Irritable Bowel Syndrome or Crohn’s Disease  – there are several mentioned in the Shadow Health module) and how the pathophysiologic changes will affect daily life for these patients. This will need to include a brief discussion

Your task is to describe an ethical issue that is

   Your task is to describe an ethical issue that is relevant to your work situation (past or current). The paper should focus on individual issues that you may face as an employee or manager. Your task is to describe an ethical issue and how it is impacting the organization.

Prompt: Submit a draft of the performance report (Section IV)

Prompt: Submit a draft of the performance report (Section IV) of your final project. Specifically, the following critical elements must be addressed: IV. Performance Report: In this section, you will develop recommendations to improve the performanceof the organization, basing your recommendations on evidence from your performance assessment. A. Determine wherethe

Homework #2 – EVSP331 – Public Lands Management The Economic

   Homework #2 – EVSP331 – Public Lands Management The Economic Contribution of Public Lands to the US Economy Question 1.  What is the economic contribution of public lands to the U.S. economy? What method is used to calculate these benefits? (25 points) Question 2. What is a cost-benefit analysis?

Punkman-Phil200

Description Instructions For this assignment, you will compose a well-written and thoughtful short-essay of 500-750 words in length (2-3 pages). Select and answer one of the four questions provided. Format & Expectations State your thesis, the answer you want to defend using at least three well-supported reasons embodying logic, reason,

The Benson Family The Benson’s have worked with the Early

The Benson Family The Benson’s have worked with the Early Intervention staff and enjoyed following up with their suggestions. Tyler, Molly’s brother, has been a great help with Molly and has helped out with the physical therapy exercises rather than playing on the tennis team as he has in the

turnover. The dataset we will use (see the Excel file

  turnover. The dataset we will use (see the Excel file named “Regression Project”) contains a wide variety of workforce data (employee demographics, and attitudes) on approximately 1000 employees. The primary dependent variables are “Attrition” and “Probability of Turnover.” Your CEO wants to better understand the factors driving employee turnover,

Setting Up the Team Management Software

Over the next several weeks we will be using Freedcamp to simulate team communication and project management. Your instructor will assign you to teams of approximately 3-5 individuals. You will be setting up the software, creating a project, interacting using the software, and reporting on its use Freedcamp – https://freedcamp.com

You may have seen how financial news outlets provide real-time

You may have seen how financial news outlets provide real-time financial market reporting. They often produce stock-market news feeds for traders; these news feeds include a stock chart. The stock chart may include different filters that allow you to see how the stock is performing today or has performed over

How do I complete a external evaluation of Macy’s based

How do I complete a external evaluation of Macy’s based from my previous papers utilizing Australia as the country for expansion using the weighted scores from my internal factor evaluation from my Week 3 and the country competitive profile matrix I completed in Week 5 to guide your decision-making. Briefly

Media-Classification & Division

Classification & Division Essay Prompt Classification and division asks that you take a complex topic, split it up into parts, and then place the divided parts into various categories, based on the purpose of the essay. First, you divide a complex and difficult topic into categories (sub-topics) for clarity and

Networking basics

You are the IT manager of an Elementary School. The school is adding computers that have been donated by a local company. An extended star topology has been suggested, using some hubs that are available. The school agrees with your idea of adding a switch working as a backbone switch,

Quantitative Design All research endeavors must, by necessity, progress through

   Quantitative Design All research endeavors must, by necessity, progress through a series of logical and meaningful steps. These steps allow a researcher to be confident that the inferences and conclusions reached at the culmination of a project are valid, unbiased, representative, and generalizable.  In Chapter 8 of the text,

If you were an executive manager in an organization, how

 If you were an executive manager in an organization, how would you structure the organization for quality improvement?  Explain why it is not enough to simply clone the benchmarking partner’s process? Shewhart describes two kinds of variation, that resulting from common causes and that resulting from special causes. Define both.

Connections Essay: Chris McCandless and Self-Reliance

We have spent this first unit exploring some of the “greats” of nature writing through the eyes of Chris McCandless (from the movie “Into the WIld” and discussed the ways in which their works influenced his life and his journey to the Alaskan wilderness. In this essay you will select

BUSI 311 Shortage of Nurses and How to Address the Problem Outline Nursing Assignment Help

  Expert Solution Preview Introduction: As a medical professor responsible for creating college assignments and evaluating student performance, my role involves designing and conducting lectures, assessing students through examinations, and providing feedback on their assignments. With a deep understanding of medical knowledge and practical applications, my goal is to ensure

I need to compare three tools by manufacturer. I.e., Cordless

   I need to compare three tools by manufacturer. I.e., Cordless Drill by DeWalt, Bosch, and Rigid a. identifies 3 relevant and reliable articles b. in your own words summarize each article 2-3 sentences c. Discuss the article in 1-2 paragraphs d. writes your conclusion to the articles in 1-2

The OSI data link layer is responsible for physical addressing,

The OSI data link layer is responsible for physical addressing, network topology, error notification, sequencing of frames and flow control. IEEE has defined numerous protocols used with TCP/IP at the OSI data link layer. They are called the IEEE 802 Standards. Choose one of these IEEE 802 standards and discuss